Sustainable Development Goals
Capacity
3,000 short t/day
Three 1,000 t/day lines, 95 MW gross, operating since 2015
Output
~540,000 MWh/yr
From about 1 million short tons processed (FY2019–20)
Metals
28,488 short t
Ferrous and non-ferrous recovered in FY2020
Due diligence and DFS investigation · Florida, USA
Palm Beach County’s second renewable energy facility (REF 2) entered commercial operation in July 2015: three 1,000-ton-a-day lines, 95 MW gross, roughly a million tons of waste and 540,000 MWh a year. Our alliance partner KBR refurbished the county’s original plant and worked on this expansion. Our investigation draws on that delivery history, because how a plant is renewed, expanded and handed over decides what it costs to run for decades.
What We Brought Together
Renew or expand? The county’s first plant opened in 1989. We assess which assets remain useful, what limits performance and how service continues during construction.
The interfaces that make capacity useful. Reception, combustion, steam, power, metals recovery and ash handling, with acid-gas treatment, fabric filters, activated carbon and SCR, plus a two-million-gallon rainwater cistern.
Delivery discipline. Through our KBR TyreNova alliance we apply the same scope, interface and responsibility definition to our own tire technology.
Why It Matters
REF 2 cost about US$672 million. In FY2020 owning and operating costs were about US$84.7 million against US$21.5 million of energy and metals revenue, and ash is about a quarter of waste processed by weight. A credible model funds the complete service, residues included.
Where It Stands
Plans approved in October 2025 envisage replacing the original plant with three 850-ton-a-day boilers. We use that progression, from refurbishment to expansion to renewal, to show clients how each stage must justify its own service and economics.
Earned Insight for Your Project
Define who makes the whole plant perform before you buy any of it. Interfaces, acceptance tests and operating duties are where large projects win or lose.
These takeaways highlight selected lessons from this case study, not an exhaustive account. Klean brings deeper technical expertise and commercial insight to each project through tailored engagements.
Considering a waste-to-energy development, refurbishment or expansion? Share your waste stream, existing infrastructure and energy market. Whether you plan to use our technology or someone else’s, a paid feasibility study or due diligence review tests the supply, process and markets. For plants built on our technology, a Detailed Equipment Quotation (DEQ) leads into a Detailed Feasibility Study (DFS) and FEED.
Detailed project history, development figures and lessons are reserved for approved client access.
About the information presented. This case concerns our ongoing due diligence and feasibility investigation. Operating and financial figures are the owner’s published results, not improvements delivered by Klean, and naming other organizations does not imply a partnership with Klean. Confidential findings are addressed within an agreed engagement. Some statements on this page are forward-looking; please see our cautionary note on forward-looking statements.
This case connects with Goals 7, 9, 11, and 12 through energy recovery, industrial infrastructure, sustainable communities, and responsible production.
We support our client’s through our quoting and project development by providing a wealth of information and specifications about Klean Industries systems and technologies.