Aerial view of red-roofed buildings, fiber process equipment and wood storage areas surrounded by fields and woodland.

The Mills Make Timber. Their Residues Make Electricity.

Sustainable Development Goals

Project Status:
Operating 2016 | Project Development & DFS 
Organizations Involved:
Klean Industries, Confidential Client
Services / Equipment:
Feasibility Studies, Design & Engineering, Due Diligence

Four installed generating units. Two mill sites. 26 MW of combined electrical capacity. Wood residues now fuel operating power plants supplying a utility under a long-term power purchase agreement. The manufacturing business gained another product to sell: electricity.

The opportunity moved from feasibility into installed equipment. That is the commercial outcome we focus on at Klean: connecting an available resource, a proven conversion system, and a paying energy customer so that a study can become a productive asset.

The Challenge

The timber business creates more than saleable timber. It also produces residual material whose value depends on finding a dependable use. For a mill owner, the investment question is direct: can that material support an energy business alongside the manufacturing business?

The answer requires three things to work together. A dependable fuel supply must support the plant. The generating system must suit that fuel and the site. Electricity must reach a buyer on terms that justify the investment. A strong result in one area cannot compensate for a missing link in another.

Feasibility is where those relationships become a decision to build. The scope extends from residue availability and preparation through to cooling, electrical integration, operating costs and the route to market.

The Solution

At each of the two mills, a pair of 6.5 MW organic Rankine cycle units was installed, creating 13 MW of generating capacity per site. Together, the four units provide a combined installed rating of 26 MW. The plants use sawmill waste wood to produce electricity for a utility customer.

ORC converts heat into electricity through a closed working-fluid circuit. Heat vaporizes the fluid, the vapor drives a turbine-generator, and the fluid condenses and recirculates. In this application, biomass provides the heat. The generating plant gives the residual material a commercial destination by producing electricity.

The long-term power purchase agreement connects the equipment to an energy market. Fuel supply, conversion capacity, and electricity sales form one operating business. The mill's production activity supplies the material; the energy installation creates a second product.

We apply that whole-project discipline when developing energy opportunities: establish the available resource, select an appropriate conversion route, and connect the output to a customer before fixing the plant configuration. Grid-export projects and onsite energy projects need different commercial models, even when both start with wood residues.

The Outcome

The equipment is installed, and the plants are operating. This is an industrial example of wood residues supporting commercial electricity production, with a defined buyer beyond the mill gate.

Installed outcome Commercial significance
4 ORC generating units Industrial deployment across two mill sites.
26 MW combined installed capacity A substantial generating asset alongside the timber operation.
Wood residues used as fuel A manufacturing residual stream supplies the energy business.
Long-term electricity purchase agreement A contracted route to market for the power produced.

The business gained an additional productive use for its resource stream. Timber remains a saleable output, while eligible residues support electricity sales. The value proposition reaches beyond managing leftover material: the manufacturing operation also hosts power-generation assets.

Installed capacity is not annual electricity delivery. Actual generation and financial returns depend on operating hours, auxiliary loads, fuel costs, maintenance, and contract terms. The demonstrated result here is the operating installation and its electricity-sales model; we assume no undisclosed savings or payback.

We carry that commercial logic into our confidential forest-products feasibility work, where biomass gasification and combined heat and power are being assessed against the host operation's own electricity and heat demand. That is a separate development engagement. Its configuration follows its own resource and customer requirements.

3 PROJECT TAKEAWAYS

1. Secure the energy customer before committing capital.

A long-term electricity buyer or a dependable onsite demand gives the generating asset a commercial purpose. Develop the route to market alongside the plant.

2. Turn residue availability into a dependable fuel plan.

Test volumes, moisture, competing uses and preparation costs over the operating life. The resource must support the investment beyond the initial stockpile.

3. Use feasibility to reach a build decision.

Integrate equipment, utilities, connection requirements, and full operating costs. The goal is a project that can advance into engineering and execution.

These takeaways highlight selected lessons from this case study, not an exhaustive account. Klean brings deeper technical expertise and commercial insight to each project through tailored engagements.

WHAT DO THESE LESSONS MEAN FOR YOUR PROJECT?

Your operation may already produce the material that could support its next energy investment. The opportunity is to establish what that resource can deliver, who will buy or use the energy, and whether the complete project earns the capital required.

Klean develops that opportunity through a paid Detailed Equipment Quotation (DEQ), Detailed Feasibility Study (DFS), and Front-End Engineering Design (FEED), with agreed decisions at each stage. Existing-facility integration may require a separately scoped paid assessment.

Bring us your residue volumes, typical moisture, current material uses, and energy requirements. We will define the appropriate engagement to develop the technical and commercial case.

Turn Your Residues into an Energy Project >> GO.

LEARN MORE

ABOUT THE INFORMATION PRESENTED

This case describes published operating biomass ORC installations and the project-development lessons relevant to Klean's work. Our confidential forest-products feasibility engagement is a separate project. We withhold client, supplier, and site identities. Installed capacity does not establish annual net output or financial returns. Proprietary information and project access remain subject to appropriate permissions and agreed engagements.

This project addresses the United Nations Sustainable Development Goals 7, 9 and 12 through biomass electricity generation, industrial infrastructure and productive use of eligible residues. Lifecycle environmental outcomes depend on sourcing, conversion, and the energy displaced.