Sustainable Development Goals
Project Status:
OPERATING | Completed 2018
Organizations Involved:
Metro Vancouver, BC Ministry of Environment, City of Burnaby, Covanta
Services / Equipment:
Feasibility Studies, Design & Engineering, Plant Efficiency Upgrades, Component Supply
The Energy Was Recovered. Another 680 Tonnes of Metal Were Still in the Ash. The plant already turned waste into electricity and recovered ferrous metal. Additional separation unlocked approximately 680 tonnes of further metal recovery each year from its bottom ash. The resource was already arriving at the facility. The opportunity was to capture more of it before disposal.
At Klean, we assess the ash as part of the resource-recovery business. Metal sales are one source of value. Reducing the quantity that requires disposal and developing accepted uses for the mineral fraction can create others. This operating upgrade shows why the investment assessment should continue beyond the electricity meter.
Energy recovery does not extract all the material value from municipal waste. Aluminum, copper, and residual ferrous metals can remain in bottom ash after combustion and initial magnetic separation. Without further recovery, usable metal leaves with a material stream that still costs money to manage.
For an operating plant, the challenge is to recover those materials without disrupting the waste-treatment service. Equipment must fit the available space, handle the actual ash, and produce saleable fractions. Moisture, particle size, metal liberation, and contamination affect recovery and the price a buyer will pay.
The larger mineral fraction deserves equal attention. Recovering metal is a clear first step; securing an acceptable use for processed ash requires its own material qualification and customer. We assess both opportunities within the same project, with separate specifications and commercial terms.
The installed upgrade combined an eddy-current separator for conductive non-ferrous metals with a second magnetic separator for additional ferrous recovery. The two stages capture different materials from the existing bottom-ash stream, extending the plant's post-energy-production recovery capability.
The reported result is approximately 260 tonnes of non-ferrous metal annually, primarily aluminum and copper, plus another 420 tonnes of ferrous metal. Together, they represent approximately 680 tonnes a year of additional material recovered by the added systems.
We develop an upgrade around the product a buyer will accept. Representative sampling establishes what remains after existing recovery. Separation trials establish recoverable quantities and concentrate quality. Buyer terms then translate that output into realizable proceeds after transport, processing charges, and deductions.
For the mineral stream, the sequence is equally practical: characterize the ash, define a proposed use, verify performance and environmental acceptance, and secure a destination. Metal recovery and mineral preparation can reinforce each other, but each output must meet its own requirements.
The strongest result is additional recovery from infrastructure already in operation. The added equipment produces approximately 680 tonnes of metal annually from a stream the facility was already handling. That is a measurable expansion of resource recovery within the existing waste-treatment system.
| Demonstrated material outcome | What it establishes |
|---|---|
| Approximately 260 tonnes/year of non-ferrous metal | Additional recovery, primarily aluminum and copper. |
| Approximately 420 tonnes/year of ferrous metal | Further capture beyond the original recovery stage. |
| Approximately 76,300 tonnes of bottom ash used in construction | A cumulative, project-specific beneficial-use outlet for the mineral stream. |
The construction quantity is a completed project total, not an annual recovery rate. It demonstrates the scale an accepted outlet can absorb without implying that every tonne of ash qualifies for the same use.
The updated financial context makes the next recovery decision tangible. In the latest plant-specific financial breakdown, bottom-ash disposal cost approximately C$1.75 million and fly-ash disposal approximately C$1.87 million. Together, those two lines represent about C$3.63 million of annual ash-disposal expenditure.
| Facility financial context: 2024 actuals | Reported amount, CAD |
|---|---|
| Bottom-ash disposal | C$1,752,556 |
| Fly-ash disposal, a separate waste stream | C$1,873,316 |
| Combined ash-disposal expenditure | C$3,625,872 |
| Facility-wide metals revenue, owner's reported share | C$291,477 |
These figures describe the facility's existing accounts. They are not the savings or revenue attributable to the added separators. A bottom-ash upgrade must be evaluated against the bottom-ash costs it can actually avoid; the fly-ash bill requires a separate treatment solution. Metal proceeds and disposal savings are measured after recovery costs and product qualification.
The investment opportunity is to improve both sides of that equation: recover material that can be sold and reduce disposal expenditure where an accepted outlet makes that possible. We bring the recovery configuration, product buyers, and residual-management costs into one assessment before committing capital.
1. Investigate what remains after existing recovery.
An operating plant can still contain a material-recovery opportunity. Start with the residual stream and measure additional recovery against the existing baseline.
2. Develop the metal buyer and mineral outlet together.
Saleable metal and an accepted destination for processed ash can support different parts of the investment case. Both require verified quality and commercial terms.
3. Value the costs the upgrade can actually change.
Use current available accounts and incremental proceeds. Keep bottom ash, fly ash, and whole-facility revenues separate when assessing the return.
These takeaways highlight selected lessons from this case study, not an exhaustive account. Klean brings deeper technical expertise and commercial insight to each project through tailored engagements.
Before renewing an ash-disposal contract or selecting another separator, establish what your operation is still sending away. Klean can assess the remaining metals, suitable recovery equipment, potential mineral outlets, and the expenditure a practical upgrade could reduce.
Existing facilities begin with a separately scoped paid technical and commercial assessment. New equipment opportunities can advance through a paid Detailed Equipment Quotation (DEQ), Detailed Feasibility Study (DFS), and Front-End Engineering Design (FEED), with agreed decisions between stages.
Bring us your ash tonnage, available analyses, existing recovery performance, and disposal costs. We will define the work needed to turn the remaining resource into an investment decision.
Recover More Value from Your Ash >> GO.
ABOUT THE INFORMATION PRESENTED
This case combines published operating results with Klean's approach to recovery-project development. It does not attribute facility construction or operation to Klean. The narrative omits facility and supplier identities. Financial figures are 2024 actuals from the plant-specific update published in 2025, the latest such breakdown verified for this revision. All amounts are Canadian dollars, and all tonnes are metric. Annual metal recovery, cumulative construction use, and financial results have different reporting boundaries. Proprietary information and site access remain subject to appropriate permissions and agreed engagements.
This project addresses the United Nations Sustainable Development Goals 9 and 12 through industrial recovery improvements and productive use of materials. Environmental benefits depend on verified processing performance and accepted destinations.
We support our client’s through our quoting and project development by providing a wealth of information and specifications about Klean Industries systems and technologies.
©2026 All Rights Reserved. Terms of Use