Sustainable Development Goals
Project Status:
Operational 2023 | Tri-gen System Commissioned
Organizations Involved:
Port of Los Angeles, California Air Resources Board, Kenworth, Toyota, Shell, Fastech, Toyota Logistics Services, FuelCell Energy, and freight operators
Services / Equipment:
Detailed Feasibility Studies, Due Diligence
At Klean, we design circular energy projects around the jobs the energy must do. At Toyota’s Long Beach vehicle-processing facility, Tri-gen makes that ambition tangible: one gas-fed installation supplies electricity for operations, hydrogen for vehicles, and water for washing incoming cars. A site handling about 200,000 vehicles a year becomes a working demonstration of how one integrated system can serve three everyday purchases.
That is the opportunity we pursue in our hydrogen and logistics work: connect resource recovery with the demand already moving through the customer’s business. The fuel has a fleet. The electricity has a facility. Even the water has a job waiting for it.
Keep the vehicles moving. Change what keeps them moving. An automotive terminal is a demanding place to change an energy system. Ships deliver vehicles. Teams inspect, prepare, and wash them. Trucks move them onward. Electricity, transport fuel and water support the same operation, yet are usually planned and purchased separately.
Toyota commissioned Tri-gen to bring those demands together at its Long Beach facility. The breakthrough was the fit between the conversion process and the customer: several useful outputs, with destinations close enough to make their recovery practical.
For a port operator, warehouse owner, or fleet business, that raises a much bigger question than which fuel to buy next. What could your site produce for itself, and which of your existing operating costs could become customers for the same asset?
One feedstock. Three products. A customer built into the design. Tri-gen uses a high-temperature fuel-cell process to convert gas into electricity while recovering hydrogen and water. Renewable biogas is supplied through the gas network. Within the system, methane is reformed into hydrogen; part supports electrochemical power generation, while recoverable hydrogen is purified for vehicle use. The process recovers water for reuse and the site’s wash operations.
The integration matters. The plant produces electricity and vehicle fuel together, with useful water as an additional output. This differs from using purchased electricity in a stand-alone electrolyzer.
| Published capability | Where the product goes |
|---|---|
| 2.3 MW of electricity | Toyota facility operations, with surplus exported to the local utility. |
| Up to 1,200 kg of hydrogen per day | Incoming Toyota Mirai vehicles and an adjacent heavy-duty refueling station. |
| Up to 5,300 liters of usable water per day | Vehicle washing before onward delivery. |
These are published plant capabilities, rather than guaranteed daily production. Hydrogen output can be adjusted to demand. Toyota identifies Long Beach as its first port vehicle-processing facility powered entirely by onsite-generated renewable electricity.
The water completes the picture. At its published daily capacity, the system could supply about 1.9 million liters over a full year of operation. Toyota’s launch account describes almost two million liters of potential annual relief for local water supplies. The recovered water has a nearby industrial use, in a region where conserving freshwater matters.
A 20-year customer relationship behind the equipment. Toyota contracted to purchase Tri-gen’s products for 20 years. The specialist technology company owns and operates the installation. This aligns an established industrial customer with a long-term supply business, while giving electricity above the site’s own requirements an export outlet.
For Klean, this is the investment lesson worth carrying into another project: develop the customer agreement alongside the process design. Electricity used onsite, electricity exported, hydrogen dispensed, and water reused each have a different value. Their combined contribution can support the project, provided the model reflects what customers will actually take.
Hydrogen has reached the vehicles. Water has reached the wash bay. Toyota confirmed that Tri-gen hydrogen had fueled both incoming passenger cars and a Class 8 heavy-duty truck at the adjacent station. The U.S. Department of Energy subsequently recognized the facility with a Better Project Award. The project has crossed the gap between a proposed energy concept and an operating installation serving an industrial customer.
The wider transport opportunity is substantial. Toyota’s launch estimate identified potential diesel displacement exceeding 1.59 million liters per year through hydrogen-powered Class 8 port operations. That is fleet-transition potential, not a measured fuel-saving total or additional plant output.
The nearby Los Angeles Shore-to-Store demonstration adds complementary evidence: loaded fuel-cell trucks and refueling infrastructure were tested together on a freight corridor. Long Beach Tri-gen addresses the supply side. Together, they connect fuel production with the work a truck must complete, while remaining separate projects.
What Klean brings to the next site. Our completed hydrogen-logistics feasibility work for CMA CGM and CEVA examined the connection between rooftop solar, hydrogen production, storage, warehouse energy, and fleet refueling. We brought the building and the transport operation into the same development study.
Long Beach supplies a powerful counterpart: a gas-fed route to multiple products at a logistics site. We use that distinction to make a better investment decision. A site with dependable renewable gas and continuous demand presents a different opportunity from a warehouse with a large solar roof and a scheduled returning fleet. The resource, operating profile, and customer determine the configuration.
Our work connects those choices before equipment is ordered: feedstock quality and supply, electricity demand, hydrogen purity and compression, storage, dispatch peaks, water acceptance and the agreements that turn useful output into dependable value. That is where an impressive technology becomes a project a business can operate.
The prospect for the reader is immediate: the vehicles, buildings and utilities you already manage could form the customer base for your next energy investment. Klean develops that connection into an executable project.
1. Make existing demand the foundation of the project.
A facility, a returning fleet, and an industrial water user can give multiple products customers from the outset.
2. Build the supply agreement alongside the plant.
The 20-year Toyota purchase agreement illustrates why commercial structure deserves the same attention as conversion technology.
3. Design for the operating day.
Production, storage, and dispensing must work through real fleet schedules and maintenance periods. Annual capacity alone does not establish dependable service.
These takeaways highlight selected lessons from this case study, not an exhaustive account. Klean brings deeper technical expertise and commercial insight to each project through tailored engagements.
If your business buys electricity, operates a fleet and has access to renewable gas or another recoverable energy resource, there may be a larger opportunity across those activities than any one department sees alone.
Klean can develop the process configuration, site interfaces and commercial model through a paid Detailed Equipment Quotation (DEQ), Detailed Feasibility Study (DFS) and Front-End Engineering Design (FEED), with agreed decision gates. Existing facilities can begin with a separately scoped assessment.
Bring us the site, the resource, and the fleet. We will establish what they can deliver together.
Develop Your Integrated Energy and Hydrogen Project >> GO.
Watch the Port of Long Beach’s project overview to see how the installation connects to Toyota’s vehicle-processing operation and its three useful products.
This case connects the published Toyota Long Beach installation with Klean’s separate project-development and feasibility experience. Toyota commissioned Tri-gen; its specialist technology provider owns and operates the plant. Construction was completed in 2023, followed by the formal opening in 2024. Published capabilities and potential savings are not audited annual operating results. Renewable claims depend on fuel sourcing and environmental-attribute accounting; the U.S. Department of Energy describes biogas use, or natural gas with renewable thermal certificates when necessary. Combustion-free power generation does not mean the complete supply chain has zero carbon emissions. The external video retains its original publisher and project credits.
The project addresses United Nations Sustainable Development Goals 6, 7, 9, 12 and 13 through water reuse, renewable energy, industrial infrastructure and more efficient resource use. Actual environmental outcomes depend on operation and the supplies displaced.
We support our client’s through our quoting and project development by providing a wealth of information and specifications about Klean Industries systems and technologies.
©2026 All Rights Reserved. Terms of Use