GLOBAL PROJECTS & INDUSTRIAL EXPERIENCE

Technology development, commercial delivery and lessons that strengthen investment decisions.

Klean Industries develops, licenses and integrates technologies that recover valuable resources from waste. We design and deliver solutions for industrial customers, combining process engineering, equipment, product upgrading and project development expertise. We also evaluate selective ownership and operating opportunities where there is a clear strategic fit.

Our experience spans commercial installations, pilot and demonstration programmes, feasibility studies, facility upgrades, and independent assessments of existing plants. These assignments serve different purposes. Each case study identifies the project context, Klean’s role and the outcomes relevant to that engagement.

Pilot and demonstration facilities answer defined technical questions. They test feedstocks, validate assumptions and generate knowledge that informs intellectual property and subsequent engineering. Their contribution is measured against their research objectives and the evidence they produce.

Other assignments involve facilities originally designed, supplied or constructed by third parties. Klean may be engaged later to assess performance, evaluate recovery options, implement improvements or manage decommissioning. These case studies explain the original project conditions and Klean’s subsequent contribution, sharing lessons that can help prevent costly mistakes elsewhere.

That experience informs our approach to every new opportunity. We assess feedstock security, product specifications, customer demand, permitting, operating capability and financial capacity before advancing equipment procurement. Our focus is long-term industrial service, maintainable equipment and commercially viable products. We select engagements where the commitment and development pathway support those objectives.

For TyreNova tire recycling projects, our alliance with KBR connects Klean’s technology expertise with global licensing, engineering and project delivery capabilities.

The case studies presented here are a selected public record of our experience. Client permissions and confidentiality obligations determine what we can publish.

Apply these lessons to your project.

Begin with a Project Evaluation to establish the appropriate development pathway, including a Detailed Equipment Quotation and subsequent feasibility work where appropriate.

Start Your Project Evaluation Now » GO.

All Projects Must: Create Symbiosis Between Waste, Resources & Energy Location
Review of over 500 pyrolysis and gasification technologies and consultation on over 3,000 projects using the Best Commercially Available Technologies (BCAT) with EPCM deal structure components. EU, NA, Asia
Review of alternative sites for energy-from-waste gasification plants and consultation with statutory planning authorities and the Environment Agency on mitigation of local impacts. UK
Preparation of facility permitting application and planning consents for a pyrolysis plant designed for mixed wastes with hydrogen extraction. UK
Preparation of a new tire stewardship plan with multiple stakeholders in various countries working with governments to develop and transition to an industry-led stewardship system. Canada, Norway, Sweden, Malaysia
Process evaluation and HAZOP (hazard and operability) risk analysis of a 12MW gasifier for ASR (automotive shredder residue) contaminated with heavy metals and other chemical wastes. UK
Installation, supervision, commissioning, and technical assessment of the expansion of a carbon black manufacturing facility integrated with a tire carbonization facility for power production within a closed grid. Japan
Investigation and installation of an integrated steam superheater fueled by pyrolysis gas produced via a new tire pyrolysis plant. Norway
Development and design of a new tire pyrolysis plant with the Government of the Slovak Republic. Slovakia
Technical, economic, and risk analysis of continuous gasification of waste polyolefin plastics at an operating refinery. UK
After a third-party analysis to inform an investment valuation, we built and installed an integrating waste tire gasification and plastic liquefaction plant into an eco-industrial park. Germany
Supervised the commissioning of a wood-waste pellet mill plant characterization of wood as input for a gasification power plant and problem-solving of combustion failures. Canada
Review and assessment of detailed engineering for a new wood waste-fired power plant, including fuel analysis, gasification & combustion tests, bio-crude production, and evaluation of fuel pre-treatment methods. Canada
Evaluate alternative gasification methods for sludge, municipal solid waste, and wood chips to produce bio-oil (crude) and biochar. USA
Review of landfills and gas and leachate management operations plans; assessment of the potential for landfill gas utilization; and evaluation of a waste-to-energy facility to inform an investment valuation. Kuwait
Environmental upgrade of a beef processing plant, including review of designs for an electrical switch to fuel cell integration using biogas and plans for an integrated rendering plant and biodiesel production facility with zero waste. USA
Installation and completion of an environmental upgrade of the CHP plant, including a review of designs for MSW processing and the disposal and recycling of ash and slag residues. Japan
Technical assessment of the expansion of a biomass co-firing power generation facility. UK
Investigation of an integrated 4,000 tonnes per day municipal solid waste gasification system to co-produce hydrogen and power for a water desalination plant. UAE
Analysis of the economic and technical performance of several operating wind farms to inform an investment valuation. UAE
Built and installed a new Coal-to-liquids conversion project where services included design, tendering, and installation of a gasification & CHP plant for processing 1,100 to 1,500 tonnes per day, tendering and supervision of converting coal to gas with 10 reactors. China
Development and assessment of an integrated in-situ gasification oil sands project, which included design and engineering for a heavy oil upgrading facility capable of producing 50,000 barrels per day. Canada
Investigation and review of integrated wind-powered skyscraper development. UAE
Risk analysis of gasification plants includes calculating deflagration loads and modeling of gas and flue gas flows. UK

Case Studies

Tire Recycling

Tire Recycling

Driving in Change: Creating Vertically Integrated Tire & Rubber Recycling Solutions

[Learn More >> GO]
Plastic Recycling

Plastic Recycling

Re-inventing Oil: Turning Plastic Waste into Profitable Synthetic Diesel Fuel & Chemicals

[Learn More >> GO]
Solid Waste Recycling

Solid Waste Recycling

Ending Landfills: Using Advanced Thermal Treatment Technologies to Recoverable Energy & Resources

[Learn More >> GO]