Casella Plans Moreau Hauling Base to Support Two New York Counties
New York Waste Hauling
Casella Waste Systems has selected design-build contractor ET to develop a new home for its Fort Edward hauling division in Moreau, New York. The planned facility would occupy a 23-acre greenfield site along Route 9 and support collection services across Saratoga and Washington counties.
The October announcement described a project in design, with construction expected to begin in spring 2027 and opening targeted for early 2028. Those are development forecasts, not confirmation that construction has started or the facility is operating.
A Base for Collection Fleet Operations
ET’s scope includes a preengineered building for administrative and operations offices, a multi-bay fleet maintenance shop and a truck wash bay. A separate storage building and a covered fueling island form part of the planned development.
The site works extend beyond the buildings. Truck and container parking, paving, stormwater management, an on-site water supply and fire-protection storage are included in the design-build package.
These elements place the investment in collection logistics and fleet support. The announcement does not describe a new recycling processing line, a materials recovery facility or additional landfill capacity.
Regional Service Growth Depends on Supporting Infrastructure
Casella provides collection, transfer, disposal, recycling and resource-management services to residential, commercial, municipal and industrial customers across the eastern United States. The Moreau development is intended to give its local hauling business a modern operating base as activity grows in the two counties.
Maintenance space, vehicle washing and container storage are less visible than downstream recycling plants, but they support the daily movement of waste and recovered materials. Bringing those functions into a purpose-designed site can address operational needs without changing the processing route for the collected material.
Atlanta-based ET reports more than three decades of experience in solid-waste infrastructure, including hauling and transfer facilities, materials recovery facilities, maintenance buildings and landfill-related works. Its award covers both design and construction of the Moreau facility.
The published project description did not establish an investment value, collection-volume increase or quantified environmental saving. The next observable milestones are construction commencement and delivery against the announced opening timetable.
You can return to the main Market News page, or press the Back button on your browser.