Landfill operators do not always have to wait for an area to reach its final configuration before beginning gas collection. Horizontal collectors can capture gas during active filling, providing an earlier control option that complements conventional vertical wells.
The Solid Waste Association of North America’s Applied Research Foundation released its Horizontal Landfill Gas Collection Systems report on May 13, 2026. The guidance addresses design, installation and operation, drawing on field experience and input from the foundation’s Disposal Group and SWANA’s Landfill Gas and Biogas Technical Division.
Earlier Capture Has Operational Trade-Offs
SWANA describes horizontal systems as useful interim and early-stage infrastructure. They can be installed relatively quickly and support emissions control while waste placement continues.
However, their position within an active landfill creates challenges. Liquid accumulation, operational lifespan and longer-term performance must be considered alongside installation cost and speed. The association does not present horizontal collectors as a universal replacement for vertical wells.
The report’s stated scope includes pipe materials, trench construction, liquid management and wellhead configurations. Case studies from North American operators examine benefits and limitations under different site conditions.
Collection and Energy Recovery Are Different Decisions
Capturing landfill gas is one part of a possible energy project. Converting it into usable fuel or electricity requires a separate assessment of gas quantity, quality, treatment needs and the receiving market.
An early collection system can improve control of a developing gas resource without automatically supporting an economic renewable-natural-gas plant. Seasonal behaviour, expected gas production over time and the remaining operating life all affect equipment sizing and investment decisions.
A feasibility study should therefore connect the collection plan with the proposed end use. This differs from purpose-built anaerobic-digestion and biomethane infrastructure, where feedstock delivery and processing are designed around a controlled plant.
SWANA makes the full report available to its members. Its public announcement establishes the guidance topics and field-based approach, rather than a single capture-efficiency figure or a standard design suitable for every landfill.
Assess the Gas Resource Before Selecting the Plant
Klean Industries supports waste-to-resource project development and technical-commercial assessment. For a landfill-gas opportunity, the useful starting point is measured flow and composition, a credible production forecast and a defined gas or power market.
Those inputs allow collection improvements, treatment requirements and potential energy output to be assessed together. Project feasibility should establish the appropriate technology and commercial structure before equipment is selected.